Legislation – The Five Estuaries Offshore Wind Farm Order 2025
SCHEDULE 15Documents to be certified
The following documents in Table 1 of this schedule are the list referred to in article 43
|
Document Number |
Name |
Version |
Date |
|---|---|---|---|
|
2.1 |
Location plan – Onshore |
Revision B |
September 2024 |
|
2.2 |
Location plan – Offshore |
Revision B |
September 2024 |
|
2.3 |
Land plans (Onshore) |
Revision G |
July 2025 |
|
2.4 |
Special Category Land Plans |
Revision D |
June 2025 |
|
2.5 |
Works Plans – Onshore |
Revision D |
February 2025 |
|
2.6 |
Works plans – Offshore |
Revision B |
October 2024 |
|
2.7 |
Offshore Order Limits and Grid Coordinates Plan |
Revision B |
September2024 |
|
2.8 |
Street Works and Access Plan |
Revision C |
January 2025 |
|
2.9 |
Temporary closure of Public Rights of Way Plan |
Revision D |
February 2025 |
|
2.10 |
Tree Preservation Order and Hedgerow Plan |
Revision B |
September 2024 |
|
2.11 |
Historic Environment Plan – Onshore |
Revision B |
September2024 |
|
2.12 |
Historic Environment Plan – Offshore |
Revision A |
March 2024 |
|
2.13 |
Statutory or Non-Statutory Sites and Features of Nature Conservation -Onshore |
Revision B |
September2024 |
|
2.14 |
Statutory or Non-Statutory Sites and Features of Nature Conservation – Offshore |
Revision A |
March 2024 |
|
2.15 |
Water Bodies in a River Basin Management Plan |
Revision B |
October 2024 |
|
2.16 |
Crown Land Plan – Offshore |
Revision A |
March 2024 |
|
2.17 |
Crown Land Plan (Onshore) |
Revision E |
June2025 |
|
2.18 |
Temporary Speed Reduction Plan |
Revision C |
December 2024 |
|
4.1 |
Book of Reference |
Revision H |
July 2025 |
|
5.5.6 |
Lesser Black-Backed Gull Implementation and Monitoring Plan |
Revision E |
August 2025 |
|
5.5.7 |
Kittiwake Implementation and Monitoring Plan |
Revision F |
October 2025 |
|
5.5.8 |
Guillemot and Razorbill Implementation and Monitoring Plan |
Revision F |
September 2025 |
|
8.1 |
Cable Statement |
Revision A |
March 2024 |
|
8.2 |
Safety Zone Statement |
Revision A |
March 2024 |
|
9.3 |
Offshore Project Design Principles |
Revision A |
March 2024 |
|
9.4 |
Onshore Substation Design Principles Document |
Revision C |
March 2025 |
|
9.12 |
Outline Cable Specification and Installation Plan |
Revision D |
March 2025 |
|
9.13 |
Margate and Long Sands SAC Benthic Mitigation Plan |
Revision H |
September 2025 |
|
9.14.1 |
Outline Marine Mammal Mitigation Protocol – Piling |
Revision E |
August 2025 |
|
9.14.2 |
Outline Marine Mammal Mitigation Protocol – UXO |
Revision E |
August 2025 |
|
9.15 |
Outline Southern North Sea Special Area of Conservation Site Integrity Plan |
Revision B |
February 2025 |
|
9.16 |
Outline Fisheries Liaison and Co-existence Plan |
Revision D |
February 2025 |
|
9.17 |
Outline Offshore Operations and Maintenance Plan |
Revision A |
March 2024 |
|
9.18 |
Outline Project Environmental Management Plan |
Revision A |
March 2024 |
|
9.18.1 |
Working in proximity to Wildlife in the Marine Environment |
Revision C |
August 2025 |
|
9.19 |
Outline Marine Written Schemes of Investigation |
Revision C |
December 2024 |
|
9.20 |
Outline Navigation and Installation Plan |
Revision D |
March 2025 |
|
9.21 |
Code of Construction Practice |
Revision G |
October 2025 |
|
9.22 |
Outline Landscape and Ecological Management Plan |
Revision H |
October 2025 |
|
9.23 |
Outline Onshore Written Scheme of Investigation |
Revision B |
March 2025 |
|
9.24 |
Outline Construction Traffic Management Plan |
Revision F |
March 2025 |
|
9.25 |
Outline Public Access Management Plan |
Revision D |
March 2025 |
|
9.26 |
Outline Workforce Travel Plan |
Revision C |
March 2024 |
|
9.27 |
Outline Skills and Employment Strategy |
Revision A |
March 2024 |
|
9.32 |
Offshore In-Principle Monitoring Plan |
Revision I |
October 2025 |
|
10.30 |
Outline Sediment Disposal Management Plan |
Revision D |
March 2025 |
|
10.47 |
Archaeological mitigation strategy |
Revision B |
March 2025 |
|
10.51 |
Deep Water Route Cable Installation Area (Future Dredging depths) |
Version 3 |
February 2025 |
|
10.65 |
Outline groundwater monitoring plan |
Revision A |
March 2025 |
|
Environmental Statement |
|||
|
6.1.1 |
Introduction |
Revision A |
March 2024 |
|
6.1.2 |
Policy & Legislation |
Revision A |
March 2024 |
|
6.1.3 |
EIA Methodology |
Revision A |
March 2024 |
|
6.1.3.1 |
Cumulative Effects Assessment Methodology |
Revision B |
December 2024 |
|
6.1.3.2 |
Transboundary Screening |
Revision A |
March 2024 |
|
6.1.4 |
Site Selection and Alternatives |
Revision A |
March 2024 |
|
6.1.5 |
Non-Technical Summary |
Revision A |
March 2024 |
|
6.1.6 |
Scoping Report and Scoping Opinion |
Revision A |
March 2024 |
|
6.2.1 |
Offshore Project Description |
Revision A |
March 2024 (for avoidance of doubt because of a discrepancy of cover sheet showing 2023) |
|
6.2.1.1 |
Detailed Offshore Project Design Envelope |
Revision A |
March 2024 |
|
6.2.2 |
Marine Geology, Oceanography and Physical processes |
Revision A |
March 2024 |
|
6.2.3 |
Marine Water and Sediment Quality |
Revision A |
March 2024 |
|
6.2.4 |
Offshore Ornithology |
Revision A |
March 2024 |
|
6.2.5 |
Benthic and Intertidal Ecology |
Revision B |
September 2025 |
|
6.2.6 |
Fish and Shellfish Ecology |
Revision B |
September 2025 |
|
6.2.7 |
Marine Mammal Ecology |
Revision A |
March 2024 |
|
6.2.8 |
Commercial Fisheries |
Revision A |
March 2024 |
|
6.2.9 |
Shipping and Navigation |
Revision A |
March 2024 |
|
6.2.10 |
Seascape, Landscape and Visual |
Revision A |
March 2024 |
|
6.2.11 |
Offshore Archaeology and Cultural Heritage |
Revision A |
March 2024 |
|
6.2.12 |
Infrastructure and Other Marine Users |
Revision B |
September 2024 |
|
6.2.13 |
Military and Civil Aviation |
Revision A |
March 2024 |
|
6.3.1 |
Onshore Project Description |
Revision C |
October 2024 |
|
6.3.2 |
Onshore Landscape and Visual Impact Assessment |
Revision A |
March 2024 |
|
6.3.3 |
Socio-Economic, Tourism and Recreation |
Revision A |
March 2024 |
|
6.3.4 |
Onshore Biodiversity and Nature Conservation |
Revision B |
September 2025 |
|
6.3.5 |
Ground Conditions and Land Use |
Revision A |
March 2024 |
|
6.3.6 |
Hydrology, Hydrogeology and Flood Risk |
Revision A |
March 2024 |
|
6.3.7 |
Archaeology and Cultural Heritage |
Revision A |
March 2024 |
|
6.3.8 |
Traffic and Transport |
Revision D |
March 2025 |
|
6.3.9 |
Airborne Noise and Vibration |
Revision A |
March 2024 |
|
6.3.10 |
Air Quality |
Revision A |
March 2024 |
|
6.4.1 |
Climate Change |
Revision A |
March 2024 |
|
6.4.1.1 |
Greenhouse Gas Assessment |
Revision A |
March 2024 |
|
6.4.2 |
Human Health and Major Disasters |
Revision B |
April 2024 |
|
6.4.3 |
Inter-Relationships |
Revision A |
March 2024 |
|
6.6.4.18 |
Onshore Biodiversity Net Gain Indicative Design Stage Report |
Revision B |
February 2025 |
|
6.8.1 |
Lesser Black Backed Gull Compensatory Areas Environmental Assessment |
Revision C |
December 2024 |
|
6.8.1.1 |
Lesser Black Backed Gull Compensatory Areas Flood Risk Assessment |
Revision B |
October 2024 |
|
6.8.1.2 |
Lesser Black Backed Gull Landscape and Visual Impact Assessment |
Revision B |
October 2024 |
|
6.8.1.3 |
Lesser Blacked Backed Gull Compensation Site – Ecological Impact Assessment |
Revision C |
December 2024 |
|
10.75 |
Supplementary Operations and Maintenance Assessment |
Revision A |
August 2025 |
|
10.76 |
Technical Memo on Revised Environment Agency Flood Mapping |
Revision A |
August 2025 |